Saturday, 7 December 2013

Measurement 1

Assignment 1

 My partner and I in the library.
 The final copy of the assignment.
        The first assignment required us to prepare a complete taking off for the structural elements of a chosen building. We were given a roll of the real construction plan. To complete this task, we formed 10 people in a group and 2 people are doing each part. We were required to produce a complete taking off, taking-off list, query list and billing quantities for all the elements of the buildings. At first we have no idea on what we going to do but we have a better understanding on what we going to do after Ms Ang brief us on the assignment. Due to the lack of the construction plan, we printed 4 copies of it so that everyone can start doing their part and brought convenient for all.
        My partner is Ng Wei Lin and we were doing the second part which is work below ground floor level including site clearance, excavation, ground floor slab, ground floor beams and apron slab. Firstly, we look through all the plans of our part. Then, we start measuring every single part carefully to avoid mistake. Some scales were given but we still need a scale rule when the scale are not given. We used almost one week to measure everything and compared the answered to achieve consistency and accuracy. After that, we distributed parts to copy. I spent my Sunday to copy all the draft into the dimension paper which is the final copy. Then, we compiled them and make a summary and billing quantities for all.
        I feel that it is very important to pay attention and take notes in the class. It is also important to understand the clauses in SMM 2 to help us in doing measurement. However, I do think that I still need to further improve myself by practicing more because the basic is important for me to continue my following semesters in QS.

Test
        I never thought that the test would be so straight forward as compared to what we did in the tutorial class. However, I think that I didn’t do my best in the test as I can score higher. Thus, I will be spending more time to prepare for my final exam.

Site visit report
 Ms Ang, Mr Zu and Mr Omar. Mr Omar is giving a short briefing before we enter the site.
 My classmates and I.
        We went for a site visit to Symphony Hills in Cyberjaya on the 29th of November. The trip was leaded by Ms Ang. Before going for it, we were informed by Ms Ang that everyone of us must have a helmet for our own safety. It was a new experience for me to go for a visit at a construction site. During the site visit, I have seen the physical things that we learnt in Measurement 1 such as soffit and pad footing. It was a good experience as I gained knowledge from there. Now, I understand the basics of construction process as I being exposure to actual working environment on site. Furthermore, I also aware that the importance of safety on site. It gives me a better understanding in this field of construction industries. I do hope that I can go to other sites in the future.

Reflection
        Throughout the 14 weeks of learning, I gained a lot of knowledge about the work as a Quantity Surveyor. By doing the group assignment, I knew that without a good leader, we won’t be doing well. We also spent time after class to do the assignment together in the library. The cooperation of every group members is much appreciated and the team power is made up while everyone contribute in the assignment. Besides, I am able to extract and utilise the information effectively by referring to the notes and by asking questions. In addition, I am able to put theories into practise when I go for a site visit. Last but not least, I am thankful for the patience and effort of Ms Ang for teaching us and giving us extra classes. ‘A good beginning makes a good ending’, I hope things go well in my following semesters. This is just a beginning as I still have a lot to learn in the future before I become a professional Quantity Surveyor.

No comments:

Post a Comment